Battle

About this station

Platforms

Platform 1 towards London
Platform 2 towards Hastings

Current accessibility

Platform 1 has step-free access as it’s on the side of the station entrance
Platform 2 has stair access via the footbridge only

Photos

 

Progress

Battle was submitted for the 2014 round of AFA but it was refused by the DfT.
It was submitted again for the 2019 round of AFA but refused
"We did not win funding last time and the rationale as to why the bid failed was not clear. That is why I wanted assurance from the rail minister that criteria for the next funding round is absolutely transparent to ensure that stations which succeed in their bids are those which clearly met the criteria. The minister confirmed that she would take those points back to the Transport department.“ (Huw Merriman, local MP and subsequent rail minister, inyourarea.co.uk)

Links

Official sources

Local MP

News

2013
2015
2022
2024

Blogs/unofficial

 

Forums

Â