Property
Dropdown value
Value
Flags
Title (not in use)
Property
Dropdown value
Text value
Funding
Date
Flags
Value
Title (not in use)
About this station
Platforms
Platform 1 towards London
Platform 2 towards Hastings
Current accessibility
Platform 1 has step-free access as it’s on the side of the station entrance
Platform 2 has stair access via the footbridge only
Photos
Â
Progress
Battle was submitted for the 2014 round of AFA but it was refused by the DfT.
It was submitted again for the 2019 round of AFA but refused
"We did not win funding last time and the rationale as to why the bid failed was not clear. That is why I wanted assurance from the rail minister that criteria for the next funding round is absolutely transparent to ensure that stations which succeed in their bids are those which clearly met the criteria. The minister confirmed that she would take those points back to the Transport department.“ (Huw Merriman, local MP and subsequent rail minister, inyourarea.co.uk)
Links
Official sources
Local MP
News
2013
2015
2022
2024
Blogs/unofficial
Â
Forums
Â